Extension of the Airbus Production Site in Hamburg for the planned assembly of the Jumbo Airliner A380
Client
Ministry of Economic Affairs of the Free and Hanseatic City of Hamburg, Germany, Department of Port and River Engineering.
Management
Organisation for Realisation Finkenwerder mbH
Contractor
German consortium headed by: Josef Möbius Bau- Aktiengesellschaft
Reclamation by German, Danish and Dutch Subcontractors
Specification
Reclaimed area: 160 ha, (395 acre)
Reclaimed Volume: 12.2* 106 m3 (el. Measurement during dredging)
Project duration: 2001.04.01 - 2002.11.20
HMT Scope of Work
Progress monitoring and control of dredging operations
Calculation and documentation of:
-
Volumes and masses (for down payment)
-
Transport distances (for down payment)
-
All operational periods, e.g. sailing, dredging, discharging (for down payment)
-
Position and depth of all dredging elements (for authorities)
-
Sand delivery sites and dredged quantities (for authorities)
-
Performance of the desalination processes (for authorities)
-
Discharge method and location (for planning staff)