Maintenance dredging with "weighted load volumes"
Client
Hamburg Port Authority, HPA
(Strom- und Hafenbau)
Specification
Reclaimed Volume: 11.1* 106 m3 (el. Measurement during dredging)
Total number of projects (since 1996) : 20
HMT Scope of Work
Maintenance dredging in the Hamburg Harbour was among the first applications for the HMT system. For this purpose a rating method was developed, using the achieved load density as an arbitrary figure.
Within a bonus-malus system a high density corresponds to a high value of the load.